Mobile Plants for More Flexibility
In addition to our fixed ready-mixed concrete plants found throughout Quebec, we have mobile plants that are available to our clients.
To Extend our Service Scope
Our mobile plants allow us to serve clients throughout Quebec.
For Large Projects
Mobile plants are used for major projects requiring a large and constant supply of high-quality products. By being on-site, the mobile plant eliminates the risk of diminished quality due to extended transportation times by the concrete mixer (i.e. traffic jam), while reducing the number of concrete mixers and mileage on the road. These are obvious and environmental benefits.
Our Mobile Plant Models
Heltzel plant file.pdf (in French)
Johnson plant file.pdf (in French)
Erie Strayer plant file.pdf (in French)
Projects Using Mobile Plants:
Temiscouata Wind Farm (TM1 and TM2)
Owner: Boralex
Project Manager: Hamel Construction INC
Work Site: Temiscouata-sur-le-Lac
Contract Volume: 32 wind turbines/15 000 m3
Contract Date: 2014
Montreal Airport
Owner: ADM
Project Manager: EBC Inc.
Work Site: Dorval
Contract Volume: 10 000 m3
Contract Date: 2014
Le Granit wind farm
Owner: EDF Énergie Nouvelles
Project Manager: Boréa Construction ULC
Work Site: Saint-Robert-Bellarmin
Contract Volume: 12 wind turbines/5 000 m3
Contract Date: 2014
Rivière-du-Moulin wind farm
Owner: EDF EN Canada
Project Manager: CER s.e.n.c. (Construction Énergie Renouvelable)
Work Site: Parc des Laurentides, MRC de Charlevoix and Fjord-du-Saguenay
Contract Volume: 175 wind turbines/45 000 m3
Contract Date: 2013-2014
Beaupré Seigneury -Wind farm 4
Owner: Eole Beaupré GP and Boralex Inc.
Project Manager: Boréa Construction ULC
Work Site: Land of the Seminar of Beaupré Seigneury
Contract Volume: 28 wind turbines/12 500 m3
Contract Date: 2013
Massif du Sud wind farm
Owner: EDF Énergie Nouvelles
Project Manager: CER s.e.n.c (Construction Énergie Renouvelable)
Work Site: Massif du Sud Regional Park, MRC des Etchemins and Bellechasse
Contract Volume: 72 wind turbines/28 000 m3
Contract Date: 2012
Highway 30
Owner: NA30
Project Manager: Les Entreprises Claude Chagnon
Work Site: Vaudreuil-Dorion
Contract Volume: 10 000 m3
Contract Date: 2012
Highway 30
Owner: Nouvelle Autoroute 30 SENC
Project Manager: Dragados Acciona
Work Site: Beauharnois
Contract Volume: 39 200 m3
Contract Date: 2010-2011-2012
Highway 20 East
Owner: Ministère des Transports du Québec
Project Manager: Les Entreprises Claude Chagnon
Work Site: Saint-Nicolas (Levis)
Contract Volume: 22 000 m3
Contract Date: 2010-2011
Nuclear power plant
Owner: Hydro-Québec
Project Manager: Les Entreprises Claude Chagnon
Work Site: Gentilly
Contract Volume: 15 400 m3
Contract Date: 2009-2010
Distribution Centre, 1,500,000 ft2
Owner: Canadian Tire
Project Manager: Broccolini – Alta Consortium
Work Site: Coteau-du-Lac
Contract Volume: 35,000 m3
Contract Date: 2007
Spillway – Hydroelectric dam
Owner: SEBJ
Project Manager: Béton Fortin Inc.
Work Site: Eastmain
Contract Volume: 11 500 m3
Contract Date: 2004
Autoroute 40, Eastbound lanes
Owner: Ministère des Transports du Québec
Project Manager: Construction D.J.L. Inc.
Work Site: Anjou Interchange, Marien Blvd
Contract Volume: 37 500 m3
Contract Date: 1999